By Admore Mbonda in Kariba THE Zambezi River Authority (ZRA) has shifted its focus outward turning an international joining announcement into a signal of stronger governance, greater accountability, and wider…
By Admore Mbonda in Kariba Lake Kariba has recently observed a marginal yet encouraging rise in water levels, raising hopes for improved hydropower production in the coming months. The Zambezi…
By Admore Mbonda in Kariba The Zambezi River Authority (ZRA) has announced an increase in the volume of water allocated for electricity generation at the Kariba Dam for the 2026…
By Admore Mbonda | Kariba The Zambezi River Authority (ZRA) has reported a worrying drop in Kariba Dam water levels, reversing the gains made during the winter months. The decline…
By Admore Mbonda in Kariba KARIBA — The Zambezi River Authority (ZRA) will carry out a controlled leakage test on Sluice 3 at Kariba Dam on July 2, 2025, as…
By Admore Mbonda iKariba Zimbabwe’s electricity demand is projected to surge to a staggering 6,300 megawatts (MW) by 2050, signaling an urgent need for expansion in the nation’s energy infrastructure.…
By Admore Mbonda, Kariba Lake Kariba’s water levels are showing gradual improvement thanks to the ongoing rainy season, raising cautious optimism for better hydro-power generation in the months ahead. As…
By Admore Mbonda, Kariba Kariba — The Zambezi River Authority (ZRA) has reported a steady increase in water levels at Lake Kariba, attributed to recent rainfall across the region. As…
By Admore Mbonda in Kariba The Zambezi River Authority (ZRA) has assured the public that the Kariba Dam remains structurally sound despite a recent series of earthquakes in the region.…
By Admore Mbonda in Kariba KARIBA– A wave of anxiety has swept through Kariba as numerous residents renting properties from the Zambezi River Authority (ZRA) have reported alarming discrepancies in…